Free Field Resource

Your Outage Starts Here.

Get the Boiler Outage Field Quick-Reference Card, the field guide every WtE and high-fouling boiler engineer should have during a major outage.

RES
Rafael E. Sanchez
Author, Boiler Outage Mastery · Field Engineering Manual
100% Free
Get Instant Access

Enter your email below. The Quick-Reference Card will be delivered directly to your inbox.

No spam. Unsubscribe anytime. Your email is safe.

What's inside
Screening Thresholds
8 Engineering Equations
RBI Risk Bands
Damage Mechanism Quick-ID
Hydro & Startup Checklists

Built for the Field.
Not the Classroom.

01
Mechanism-based, not generic

WtE boilers do not fail randomly. They fail by mechanism. This card helps field teams identify the likely driver quickly.

02
Decisions under pressure

During an outage, repair decisions must be made quickly. The card gives fast screening logic for field judgment.

03
Code-referenced, field-tested

The content is aligned with ASME BPVC, NBIC, EPRI guidance, and practical outage execution.

04
Print it. Keep it in your bag.

Designed as a field-ready quick-reference tool for outage managers, inspectors, engineers, and supervisors.

5 Sections.
Everything You Need Onsite.

01
Field Screening Thresholds Waterwall wall loss, bulging, superheater damage, economizer FAC, refractory hold criteria, and weld QA release gates.
02
Key Screening Equations Hoop stress, corrosion rate, remaining life, thermal stress, Larson-Miller, CPI/SPI, and Net Technical Value.
03
RBI Risk Matrix Probability × consequence bands with minimum required response for low, medium, and high-risk findings.
04
Damage Mechanism Quick-ID Active oxidation, molten-salt attack, FAC, erosion, creep, and refractory dryout failure.
05
Hydro & Startup Checklists Pre-hydro readiness, service-release checks, and first 48–72 hour restart watch items.
+
From the Full Handbook Extracted from Boiler Outage Mastery, the field engineering manual for WtE and high-fouling boiler outages.
RES
Rafael E. Sanchez
Author · Field Engineer · WtE Specialist

Boiler Outage Mastery was developed as a disciplined, field-practical, and technically rigorous reference for leaders responsible for planning, executing, inspecting, repairing, and restarting major boiler outages in waste-to-energy and other high-fouling steam generator service.

V6
Field-refined handbook version
24
Chapters covering the outage lifecycle
12
Appendices with templates and checklists
83
Pages of mechanism-based guidance

Get the Card.
Start Every Outage Right.

Free for WtE and high-fouling boiler engineers. No credit card. No catch.

GET THE FREE CARD →